Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints

Janusz Edward Kulejewski , Nabi Ibadov , Michał Krzemiński

Abstract

Paper presents the original method of construction scheduling using fuzzy sets theory. The essence of the method is to obtain an optimal construction schedule based on the solution of the fuzzy RCPS problem with flexible restrictions. The article introduces two important modifications of the considered issue. These modifications are: maximization of the degree of fulfillment of customer preferences regarding the time span of the project implementation and the contractor's preference regarding the level of use of renewable resources, for example - the level of employment of workers. The article also contains a numerical example showing the procedure for applying the described method.
Author Janusz Edward Kulejewski (FCE / ICE)
Janusz Edward Kulejewski,,
- The Institute of Civil Engineering
, Nabi Ibadov (FCE / ICE)
Nabi Ibadov,,
- The Institute of Civil Engineering
, Michał Krzemiński (FCE / ICE)
Michał Krzemiński,,
- The Institute of Civil Engineering
Journal seriesMATEC Web of Conferences, ISSN , e-ISSN 2261-236X, (0 pkt)
Issue year2018
Vol196
Pages1-8
Publication size in sheets0.5
ConferenceXXVII Russian-Slovak-Polish Seminar Theoretical Foundation of Civil Engineering (TFoCE 2018), 17-09-2018 - 21-09-2018, Rostov-on-Don, Rosja
Keywords in Englishoptimal construction schedule, fuzzy sets theory, numerical example
DOIDOI:10.1051/matecconf/201819604045
URL https://www.matec-conferences.org/articles/matecconf/abs/2018/55/matecconf_rsp2018_04045/matecconf_rsp2018_04045.html
Languageen angielski
File
matecconf_rsp2018_04045.pdf 447.2 KB
Score (nominal)5
ScoreMinisterial score = 0.0, 19-10-2018, ArticleFromJournal
Ministerial score (2013-2016) = 5.0, 19-10-2018, ArticleFromJournal - czasopismo zagraniczne spoza list
Citation count*
Cite
Share Share

Get link to the record


* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back