Influence of Anchoring Cables Position on Load Carrying Capacity of Tension Transmission Tower

Szymon Spodzieja , Ireneusz Czmoch

Abstract

In the last stage to install conductors to insulation chain hanging on transmission tower conductors have to be pulled extra 20 cm. Small shortening of conductors (in comparison to span length) cause much greater horizontal forces imposed on tower supporting conductors. These forces are not taken into account when the tower is designed under normal loads. The paper deals with analysis of the tension transmission tower M6W, designed according to standard procedure and subjected to extraordinary loads when power and ground conductors have to be installed with help of anchoring cables. The main goal of this paper is to specify safe combination of different parameters: the distance between the axis of tower and anchoring foundation, position of winch, influence of existing already installed conductors
Author Szymon Spodzieja IIB
Szymon Spodzieja,,
- The Institute of Civil Engineering
, Ireneusz Czmoch IIB
Ireneusz Czmoch,,
- The Institute of Civil Engineering
Journal seriesProcedia Engineering, ISSN 1877-7058
Issue year2016
Vol153
Pages679-686
Publication size in sheets0.5
ConferenceXXV Polish – Russian – Slovak Seminar “Theoretical Foundation of Civil Engineering", 11-07-2016 - 16-07-2016, Zilina, Słowacja
Keywords in English tension transmission tower; anchoring cables; installation of conductors
DOIDOI:10.1016/j.proeng.2016.08.226
Languageen angielski
File
Spodzieja Sz.pdf (file archived - login or check accessibility on faculty) Spodzieja Sz.pdf 214.47 KB
Score (nominal)15
ScoreMinisterial score = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Ministerial score (2013-2016) = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Citation count*0 (2016-09-19)
Cite
Share Share



* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back