Chosen Criteria of Construction Schedule Evaluation

Michał Krzemiński

Abstract

In the article, the author considers the subject of evaluating construction schedules. The evaluated schedules result from the use of schedule equalization model utilising a model including efficiency coefficients for subsequent working brigades whose task was to assist preceding brigades. As a result of using the model, a number of schedules is obtained. It is not manifest, however, that it is the use of the latter that would be the optimal choice. The optimal schedule is one where a reduction of working brigade downtime was achieved without prolonging the brigades’ work time unduly.
Author Michał Krzemiński IIB
Michał Krzemiński,,
- The Institute of Civil Engineering
Journal seriesProcedia Engineering, ISSN 1877-7058
Issue year2016
Vol153
Pages345-348
Publication size in sheets0.5
ConferenceXXV Polish – Russian – Slovak Seminar “Theoretical Foundation of Civil Engineering", 11-07-2016 - 16-07-2016, Zilina, Słowacja
Keywords in EnglishEvaluation criteria; Construction schedule; flow shop models
DOIDOI:10.1016/j.proeng.2016.08.125
Languageen angielski
File
KRZEMIŃSKI M..pdf (file archived - login or check accessibility on faculty) KRZEMIŃSKI M..pdf 379.7 KB
Score (nominal)15
ScoreMinisterial score = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Ministerial score (2013-2016) = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Citation count*0
Cite
Share Share



* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back