Structural analysis of tension tower subjected to exceptional loads during installation of line conductors
K. Fedor , Ireneusz Czmoch
Abstract
The paper presents results of study dealing with verification of the impact of different installation options (defined by the distance and tilt of anchoring cables from the tower axis and the distance and tilt of winch from the tower axis) to meet the limit state conditions for the tension tower subjected to exceptional loads during installation of overheads lines. 36 optional positions of anchor and winch have been considered. In current practice both the winch and the anchor are mounted at the distance from the axis of tower equal to 2 times H (where H - the distance above ground level on which an anchor or cable are fixed to the tower). It has been shown that the anchor as well as the winch can be fixed to the temporary foundations at the distance equal to H without any hazard to the safety of the structuresAuthor | |||||
Journal series | Procedia Engineering, ISSN 1877-7058 | ||||
Issue year | 2016 | ||||
Vol | 153 | ||||
Pages | 136-143 | ||||
Publication size in sheets | 0.5 | ||||
Conference | XXV Polish – Russian – Slovak Seminar “Theoretical Foundation of Civil Engineering", 11-07-2016 - 16-07-2016, Zilina, Słowacja | ||||
Keywords in English | ension transmission tower; installation of line conductors; anchoring cables | ||||
DOI | DOI:10.1016/j.proeng.2016.08.093 | ||||
Language | en angielski | ||||
File |
| ||||
Score (nominal) | 15 | ||||
Score source | conferenceIndex | ||||
Score | = 15.0, 03-02-2020, ArticleFromJournalAndMatConfByConferenceseries = 15.0, 03-02-2020, ArticleFromJournalAndMatConfByConferenceseries | ||||
Publication indicators | = 1; = 1 | ||||
Citation count* |
* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back