SCHEDULING OF CONSTRUCTION WORKS UNDER FUZZY TIME CONSTRAINT

Nabi Ibadov , Janusz Ewdward Kulejewski

Abstract

Abstract: The paper presents a method of assessing the level of satisfaction of fuzzy constraint of time for the execution of construction works. A novelty of the method is the use of probabilistic measure, in conjunction with the concept of α- cuts of a fuzzy number. The application of the presented method is demonstrated in a numerical example, which shows the compliance of the evaluation results with those obtained with the simulation methods.
Author Nabi Ibadov IIB
Nabi Ibadov,,
- The Institute of Civil Engineering
, Janusz Ewdward Kulejewski IIB
Janusz Ewdward Kulejewski,,
- The Institute of Civil Engineering
Pages138-143
Book XI International Scientific Conference-VSU. Vol.1, 2, 2011, CIVIL ENGINEERING HIGHER SCHOOL, CD-ROM
Keywords in Englishconstruction project makespan, fuzzy scheduling, probabilistic measure
Languageen angielski
Score (nominal)0
Citation count*0
Cite
Share Share

Get link to the record
msginfo.png


* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back