Optimization of the Construction Schedule for Paving a Parking Area with Concrete

Michał Krzemiński

Abstract

The article presents the problem of balancing work for schedules carried out in accordance with Linear Construction Methods. An example is presented of the construction of concrete surface. A number of schedules were developed for the collected data. The preeminent schedule was chosen and then optimized by curtailing working time of preceding working brigades with aid of subsequent brigades. The article presents a model which assumes that the effectiveness is equal for all brigades. Such an assumption was possible due to the nature of the activities to be performed.
Author Michał Krzemiński IIB
Michał Krzemiński,,
- The Institute of Civil Engineering
Journal seriesProcedia Engineering, ISSN 1877-7058
Issue year2016
Vol153
Pages349-354
Publication size in sheets0.5
ConferenceXXV Polish – Russian – Slovak Seminar “Theoretical Foundation of Civil Engineering", 11-07-2016 - 16-07-2016, Zilina, Słowacja
Keywords in EnglishConstruction schedules; flow shop models; lineral schedules
DOIDOI:10.1016/j.proeng.2016.08.126
Languageen angielski
File
KRZEMIŃSKI M.-OPTIMIZATION.pdf 801.07 KB
Score (nominal)15
ScoreMinisterial score = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Ministerial score (2013-2016) = 15.0, 28-11-2017, ArticleFromJournalAndMatConf
Citation count*0 (2018-06-22)
Cite
Share Share

Get link to the record
msginfo.png


* presented citation count is obtained through Internet information analysis and it is close to the number calculated by the Publish or Perish system.
Back